Larval period monkey breeding

Also known as “knowledge”, the baboons live in tropical and subtropical and temperate regions, and the frigid zone is less common. The nymph of the cricket is called ape monkey, monkey or turtle. The simian monkey is cold and odor-flavored. It has the functions of dispersing wind, promoting lung, relieving heat and shocking. The apes are nutritious, delicious, and stylish as a delicacy. The use of artificially farmed apes is simple, with minimal investment and quick results. The collection of eggs. In sunny weather, the females mostly concentrate on the branches of the lush willow and apple trees of the year. They also like to spawn on the white wicker. After spawning, the branches will blight on their own from 3 to 10 days. After careful observation, they will see the granular eggs attached to the withered branches. The young nymphs that hatch from the seedlings can be made by picking withered branches. There are about 50 to 100 eggs in one egg. Per square meter can be planted 2 to 3 egg branches. Select the venue. Sites for planting egg branches should be selected in willow forests, old apple orchards, and wicker riverbeds. Soil requirements are not desertification, no compaction, no ants, foraging rats, loose moist soil zone, you can also choose the place where the older monkeys do more places to plant the egg branches. Embed the egg branches. White wicker seedlings can be excavated on the riverside or in moist areas and planted in loose soil, with a spacing of 35 centimeters, a row spacing of 90 centimeters, and a mu plantation of 2003 plants. Between the two rows of white wicker, the ditch is 3 cm deep and buried 3 cm in the cover of the egg; it can also be in the willow woods, in the old apple orchard, 2 meters away from the main trunk, 3 cm deep ditch, buried eggs Branches, solid ground cover can be. Aquaculture management. After the eggs are buried underground, pay attention to drainage and flood prevention during the rainy season. The white wicker, willow or apple tree should be watered early. While watering, farmer's manure should also be applied to promote flourishing growth and provide enough nutrient sources for the larvae of pupa, the young calf monkeys, so that the young baboon monkeys can thrive and grow and increase the individual's output. We must guard against human and livestock trampling and natural enemies such as ants. Harvesting and processing. Two to three years after colonization of egg branches, the monkeys gradually began to mature. The collection period is generally during the summer solstice. In the event of seeping rain, one or more fertile, awkward monkeys can easily drill from the ground between 4 am and 5 am, or they can drill in the rain. Out of the ground, they quickly find the wicker or trunk to crawl. After 2 hours to 4 hours, it will molt and become 蝉 (know). According to this characteristic of the apes, if there is no rain and drought after the summer solstice every year, artificially irrigating the breeding grounds can lead the monkeys to be unearthed. Before the monkeys unearthed, or before the monkeys matured, a smooth plastic film could be wrapped around the 30-cm-high trunk off the ground so that the ape could not continue crawling on the trees for harvesting.

Our wooden working machine use advanced technique to make motor. So there is higher & stronger power. Using longevity is more longer. Little sparkling, perfect gear noise and more accurate cutting precision.
Circular Saw have plastic motor house and aluminium motor house. Big additional handle is more safety for using. Size is 7`,8`,9`,10`,12`.
Miter saw has more accurate adjustable precision.8427U is 12` biggest blade. Vertical and level adjustable degree is 0-45degree. More higher Input power. Size is 10`,12`.
Ordital grinder size is 93x185mm, 110x100mm
Electric trimmer has higher power. Make the working is more easy and more happy.
Corner assemblying machine give more professional tools to use.
Electric Chain Saw have 1600W high power. Easy user. Don`t like gasoline Chain Saw so complex operation.

Safety rules
1. Pls read the operation manual carefully before using.
2. Before installing the blade must check the machine no-load about one minute. After installing the blade. Check the blade is installed safety and work no-load normally. If there is abnormal, pls remove the blade and install again.
3. Don`t use any broken blade. Before install, must check the blade is safe and no broken.
4. Finishing working, pls take off the power quickly.
5. Keep work area clean.
6. Finishing working, clean and pack the machine and blade. Maintenance your working machine.

Woodworking Machine

Woodworking Machine,Combination Woodworking Machine,Combined Woodworking Machine,Multi Woodworking Machine

ZHE JIANG ULITE TOOLS MANUFACTURE CO.,LTD , http://www.ulitepowertool.com